Home Renovation: Complete Guide 2026

November 10, 2026

Housing rehabilitation involves making changes to an existing building or home to improve its safety, livability, accessibility, or energy efficiency. It is not the same as a renovation, and this difference affects the permit requirements, VAT, and financial assistance.

At Domoblock, we renovate homes in every house-flipping project. As Sergio says, “there are many properties that need renovating,” and what’s most underestimated isn’t the construction work itself, but the paperwork. In this guide, we’ll go over permits, costs, financial assistance, and taxes for 2026.

‍

What Is Home Rehabilitation?

Housing rehabilitation has two definitions that do not align: a construction project may be considered rehabilitation by an architect but not by the tax authorities.

‍

Obreros trabajando en la rehabilitación de la fachada de un edificio

‍

Technical and Urban Planning Definition

The Land and Urban Renewal Act defines building renovation as maintenance work or interventions on existing buildings, their facilities, and common areas (Art. 7.2.b of Royal Legislative Decree 7/2015). This ranges from repairing a roof to installing an elevator.

What the Tax Authority Considers Rehabilitation

For VAT purposes, a project is considered renovation only if it meets two requirements (Art. 20.1.22.B of the VAT Law, effective in 2026):

  • More than 50% of the cost relates to the structure, facade, roof, or similar or related work.
  • The total cost exceeds 25% of the purchase price (if you purchased the property within the previous two years) or the market value, excluding the land.

An example: if you purchased an apartment for €150,000, of which €30,000 is the land value, the renovation work would need to cost more than €30,000. This is a common mistake: replacing the kitchen, bathroom, and flooring can be very expensive yet still be classified as a “renovation” by the tax authorities.

‍

‍

Differences Between Rehabilitation and Renovation of a Home

The difference between a renovation and a rehabilitation can be seen in four key areas:

  • Scope of the work: structure and essential elements versus specific improvements—rehabilitation involves the structure, building envelope, or systems; renovation involves finishes and layout.
  • Type of permit or prior notification: if the structure, volume, or facade is altered, a project plan is required (Art. 2.2.b of the Building Regulations Act) and, generally, a permit. An interior renovation is usually handled with a sworn statement.
  • Applicable VAT: Renovation is taxed at 10% (Art. 91.1.3.1 of the VAT Law). A remodeling project may also qualify if it meets the requirements outlined below.
  • Access to grants and tax deductions: Verifiable improvements in energy efficiency, accessibility, or safety are required; simply renovating is not enough.

‍

Types of Home Renovations…

Types of renovation are distinguished by the problem they address. A single project usually combines several.

Structural Renovation

This involves reinforcing or replacing beams, floor slabs, columns, or foundations. For example, replacing wooden beams damaged by woodworm. It always requires a construction plan and is usually the most expensive and unpredictable type of work.

‍

Refuerzo de vigas en la rehabilitación estructural de una vivienda

‍

Energy-Efficiency Renovation

Reduces energy consumption through insulation, energy-efficient windows, geothermal systems, or solar panels. This is the type of renovation that qualifies for the most financial assistance. In our projects, as Sergio puts it, energy-efficient renovations “reduce emissions by 30–40% per project.”

‍

Instalación de aislamiento térmico en una fachada

‍

Renovation to Improve Accessibility

Removes barriers: elevator, ramp, or stairlift. In a condominium, these are mandatory if requested by a resident with a disability or who is over 70 years old, subject to cost limits (Art. 10.1.b of the Horizontal Property Law).

‍

Rampa de acceso en el portal de un edificio de viviendas

‍

Renovation of facades and roofs

Repair the building’s exterior: cracks, spalling, or a leaking roof. If insulation is added, it also qualifies as an energy-efficient renovation.

‍

Operarios reparando la cubierta de una vivienda

‍

Comprehensive Renovation

Addresses everything at once: structure, systems, layout, building envelope, and finishes. This is typical for a home that hasn’t been renovated in decades, and it’s the closest to our work in house flipping.

‍

Interior de una vivienda en obras de rehabilitación integral

‍

When to Renovate a Home

It’s best to renovate a home before a problem forces you to. Here are the signs we look for when analyzing a property:

  • Unfavorable results on the technical building inspection (ITE): The ITE and the building assessment report are regulated by each regional government and city council. An unfavorable result requires renovation work.
  • Cracks, moisture, or other structural issues: A diagonal crack requires a technician, not a painter.
  • Outdated electrical or plumbing systems: fabric-covered wires, lead pipes, or a circuit breaker panel without a ground fault circuit interrupter (GFCI).
  • Poor energy efficiency rating: an E, F, or G rating means high utility bills and makes the property harder to sell or rent.
  • Accessibility barriers: steps at the entrance or a building without an elevator.

‍

Permits and Licenses for Renovating a Home

‍

Arquitecto revisando los planos de una rehabilitación

‍

The building permit for a renovation depends on each local municipality, but the standard procedures are as follows:

  • Major building permit or sworn statement, depending on the work: this depends on how much the work affects the structure or facade.
  • Technical plans signed by an architect or construction engineer: required when the work alters the building’s configuration.
  • Payment of the construction tax (ICIO): each municipality sets its own rate, with a maximum of 4% of the cost of the work (Art. 102.3 of the Law Regulating Local Finances).
  • Approval from the homeowners’ association if common areas are affected: work on the facade, structure, or courtyards requires approval from the association meeting.
  • Additional authorization if the building is a historic landmark: this extends the deadlines.

‍

How Much Does It Cost to Renovate a Home

The cost of renovating a home varies so widely that an average is of little use, and there are no official statistics per square meter.

Factors that influence the price

  • The condition of the structure and utilities, which can only be determined once the building is opened up.
  • The floor area and height, due to scaffolding and auxiliary equipment.
  • Materials and equipment.
  • The city: labor costs differ between Madrid and Almería.
  • Professional fees, permits, and ICIO tax.

Estimated price per square meter by type of project

[SERGIO/ÓSCAR’S EXPERIENCE: cost per square meter for a typical comprehensive renovation in your projects, with dates.] [VERIFY: 2026 approximate prices by type of project, with sources.] Our advice: get three quotes with the same line items and set aside a contingency fund.

‍

‍

Housing Renovation Grants in 2026

Grants for home renovation in 2026 are primarily based on the 2026–2030 National Housing Plan, regulated by Royal Decree 326/2026, effective as of April 24, 2026. These grants are announced and administered by the autonomous communities.

‍

‍

Programs Under the 2026–2030 State Housing Plan

The renovation program covers urban and rural regeneration, entire buildings, individual homes, vacant homes for affordable rental, and protected buildings. Regarding housing renovation grants (Articles 104–112):

  • The dwelling must have been built before 2006 and serve as the applicant’s primary residence.
  • For building envelope work, up to 40% of the cost, with a maximum of €7,500 per dwelling.
  • For accessibility improvements, up to 80%, with limits of €15,000 or €18,000 depending on the disability.
  • Completion period: 12 months from the date of approval.

These are maximum amounts: each regional call for applications sets the specific amount.

Regional and Municipal Grants

Many regions and municipalities have their own grant programs for facades, elevators, or energy efficiency. These are compatible with the Plan’s grants if the total does not exceed the cost of the work (Art. 110 of Royal Decree 326/2026). Review the eligibility criteria: many do not allow work that has already begun.

ICIO and IBI Tax Credits

Municipalities may grant ICIO rebates of up to 95% for projects involving solar energy or those of special municipal interest, and up to 90% for accessibility improvements (Art. 103.2 of the Law Regulating Local Finances). For the IBI, reductions of up to 50% are available for solar energy projects (Art. 74.5). This depends on each local tax ordinance.

‍

‍

VAT and Tax Deductions for Home Renovations

VAT and income tax deductions significantly affect the final cost. Review them before signing the estimate.

Reduced 10% VAT on renovation work

Renovation and repair work on your home is taxed at 10% if three requirements are met (Art. 91.1.2.10 of the VAT Law, effective in 2026):

  • You are an individual and use the property as your primary residence (this also applies to condominiums and rental properties used as a primary residence).
  • The home was completed at least two years prior to the work.
  • The contractor’s materials do not exceed 40% of the taxable base.

This last condition is the one that costs the most: when replacing windows, the cost of materials usually exceeds 40%, and the tax rate rises to 21%. Additionally, payment must be made by bank transfer—never in cash.

Income Tax Deductions for Energy-Efficiency Renovations

Additional Provision 50 of the Personal Income Tax Law, as amended in November 2026, includes three deductions:

  • 20%: Reduce the heating and cooling demand of your primary residence or a rental property by at least 7%. Maximum base amount: €5,000 per year.
  • 40%: Reduce non-renewable primary energy consumption by at least 30% or achieve an energy efficiency rating of A or B. Maximum base amount: €7,500 per year.
  • 60%: Energy retrofit of the entire building. Maximum allowance: €5,000 per year and €15,000 cumulatively.

Note the deadlines: the 20% and 40% options cover payments made through December 31, 2026, with a certificate issued before January 1, 2027. The 60% rate is valid through December 31, 2027. Grants are deducted from the base amount.

Illustrative example: improvement of the building envelope of a primary residence built in 1985, with assistance from the State Plan and a 40% deduction.

‍

Item Amount
Work (insulation and windows) €12,000
10% VAT €1,200
Total paid €13,200
State Plan Grant (40% of the construction cost, up to 7,500 €) −€4,800
Basis for the deduction (13,200 − 4,800 = 8,400; limit €7,500) €7,500
Income tax deduction (40% of €7,500) −€3,000
Net cost to the owner 5,400

Estimated calculation: assumes the grant awards the maximum amount and a 10% VAT rate. At 21%, the total amount paid would rise to 14,520 €.

‍

‍

How to Renovate a Home Step by Step

Home renovation goes smoothly when you follow this order:

  • Technical assessment of the home’s condition: This includes the initial energy performance certificate; without it, there is no tax deduction.
  • Project plan and comparative quotes: Once the project plan is finalized, you can compare quotes.
  • Application for permits and grants: Many grants must be applied for before construction begins; review the call for applications.
  • Construction and project management: The project manager ensures that the work is carried out according to the plans.
  • Final certificates and documentation for the tax deduction: final energy performance certificate, invoices, and proof of bank payment.

‍

Renovating as an Investment: Buy, Renovate, and Sell or Rent

Renovation as an investment is our day-to-day business: buying a home that needs work below market value, renovating it, and then selling or renting it out. As Sergio says, “the difference between the costs of purchase, construction, and sale results in a capital gain.”

‍

Piso antiguo rehabilitado para su venta o alquiler

‍

The challenge lies in the details: a delay in obtaining a permit, a beam in poor condition, or a sale below expectations can wipe out the profit margin or even result in a loss. We explain this in our guides to house flipping and building flipping. That’s why Óscar insists that “choosing the right project is very important.”

Real estate investing involves risks, including the potential loss of principal, and liquidity may be limited.

‍

Frequently Asked Questions

How long does it take to renovate a home?

It depends on the type of work and the permit. A renovation based on a self-certification can begin almost immediately; a renovation requiring a building permit must wait for the permit to be issued. Under the 2026–2030 State Plan, work must be completed within 12 months for a single-family home and within 36 months for a building (Articles 103 and 112 of Royal Decree 326/2026).

Who pays for building renovations in a homeowners’ association?

The owners, according to their ownership share, unless the articles of incorporation or an agreement establishes a different allocation (Art. 9.1.e of the Horizontal Property Law). Work necessary to maintain the building is mandatory and does not require prior approval by the owners’ association. Improvement work, on the other hand, must be put to a vote.

Can grants be requested if the unit is rented out?

Yes. The 2026–2030 State Plan allows tenants whose current lease expressly authorizes them to carry out the work to be eligible for grants (Art. 105 of Royal Decree 326/2026). The property must be their primary residence. The owner may also apply, subject to the requirements of each regional call for applications.

What is a renovation agent?

It is the person or entity that manages the renovation on behalf of the owners. They are responsible for the projects, financing, and grants, which they may collect through an assignment of the right to receive payments (Art. 10 of Royal Decree 326/2026). They must have a signed agreement with the property owners or the homeowners’ association authorizing them to do so.

How Domoblock Helps You Invest in Renovation Projects

At Domoblock, we work with house flipping, building flipping, and new construction. In house flipping, we buy homes below market value, renovate them, and sell them. [CONFIRM WITH DOMOBLOCK: that there is an active purchase and renovation project.]

With our real estate co-investment opportunities, you can participate starting at €200, 100% online. It’s free for investors: you pay nothing directly, and Domoblock charges a 5% management fee, which is included in the project costs.

Real estate investing involves risks, including the potential loss of principal, and liquidity may be limited: there is no secondary market; there may be delays in construction or in the sale; you may lose some or all of your invested capital; and this capital is not covered by the Deposit Guarantee Fund. Domoblock does not offer financial instruments supervised by the CNMV.

‍

Conclusion

Renovating a home can increase its value and lower your utility bills, but the outcome depends on the order of steps: first, the energy certificate and technical assessment; next, the permit and any available grants; and only then, the construction work. If you’re eligible for the 20% or 40% tax deductions, remember that the deadline is December 31, 2026.

‍

Sources

This article is for informational purposes only and does not constitute tax, legal, or financial advice, nor is it an investment recommendation. Financial assistance depends on each regional and municipal call for applications. Past performance is not a guarantee of future results. All investments involve risks, including the partial or total loss of principal: consult a professional regarding your specific situation. Example of financial aid and tax deduction.

‍

‍

‍

Autor

Sergio Navarro

Expert in blockchain, investments, and personal finance

Do you like what you're reading?

Subscribe to our Newsletter

Do you like what you're reading?

Subscribe to our newsletter!

Financiado

Zaragoza | Downtown

Pedro María Ric, 5

DOMO-ZGZ-12
Flipping house

Funded

100%

€550,012.94

Target

€550,012.94

Estimated annual return:
12.13%
Estimated duration:
8 months
Chat with other investors and ask your questions in our Telegram group

Related articles