IEE: What it is and what it is for

October 27, 2026

When analyzing an apartment in an older building, one of the first documents we request is the Building Evaluation Report (IEE). In a few pages, it states whether the facade, roof, or facilities need repairs, if the building is accessible, and its energy performance. In short, it anticipates future assessments not yet reflected in any bill.

In this guide, we explain what the IEE is, what it evaluates, how it differs from the ITE, who is required to have one, how it is processed in Madrid, and what a buyer or investor should check.

‍

¿Quieres libertad financiera? Descarga la guía gratuita del paso a paso

‍

What is the Building Evaluation Report (IEE)?

It is a technical report that analyzes three aspects of a building: its state of conservation, accessibility conditions, and energy efficiency. It is regulated by Article 29 of Royal Legislative Decree 7/2015, the Consolidated Text of the Land and Urban Rehabilitation Law, and developed by autonomous communities and municipalities.

Following Constitutional Court Ruling 143/2017, the specific conditions (which buildings, when, and how) depend primarily on regional and municipal regulations.

Purpose and scope of the report

Its purpose is for the homeowners' association and the Administration to know the actual state of the building and plan works before a problem becomes urgent.

It is a snapshot of the building at a given time, including recommendations and, if necessary, deadlines for correcting deficiencies.

Entire building versus individual dwelling

The IEE is conducted on the entire building and its common elements: structure, facade, roof, entrance, stairs, and general facilities. It does not evaluate the interior of each individual apartment.

Therefore, an apartment that has been renovated inside may be in a building with an unfavorable IEE, and vice versa.

‍

Aspects evaluated by the IEE

State of conservation

The technician inspects the foundation, structure, facades, roofs, terraces, party walls, and common sanitation and supply facilities. This part is equivalent to the former Technical Building Inspection (ITE).

Basic conditions for universal accessibility

It analyzes whether a person with reduced mobility can access and move through the building: steps at the entrance, elevator, and passage widths. If not met, it indicates whether reasonable adjustments are possible and what they are.

Energy efficiency certification

It includes the energy efficiency certificate for the entire building, with its rating from A to G, in accordance with Royal Decree 390/2021.

‍

IEE and ITE: differences and relationship between both reports

Shared content

Both assess the building's state of conservation. In many cities, such as Madrid, the ITE remains in effect as a periodic conservation inspection.

Additional information included in the IEE

The IEE adds an assessment of universal accessibility and an energy efficiency certificate. It is, therefore, a more comprehensive report.

When a valid ITE can be integrated into the IEE

If a building has a favorable and valid ITE, a supplementary IEE can be submitted that only adds accessibility and energy efficiency. In the Community of Madrid, this supplementary IEE is valid until the ITE it supports is due for renewal.

‍

Buildings required to submit it

Age of the property

In the Community of Madrid, Decree 103/2016 primarily mandates this for multi-family residential buildings over 50 years old. In the city of Madrid, the city council grants a maximum period of five years from the time the building reaches that age.

Multi-family residential buildings

The requirement focuses on apartment buildings. Single-family homes and buildings used for other purposes generally fall under a different regulatory framework, which depends on each municipality.

Application for public subsidies

Regardless of their age, buildings applying for public subsidies for conservation, accessibility, or energy efficiency works are usually required to provide the IEE before formalizing the application.

Regional regulations and municipal ordinances

Outside of Madrid, each autonomous community and municipality sets its own deadlines and requirements. In the Valencian Community, for example, there is a specific evaluation report (IEEV.CV). Before purchasing in another city, consult the local municipal ordinance.

‍

‍

Who can perform the IEE

Qualified professionals

It must be signed by a professional with the appropriate qualifications to draft building projects or oversee construction work: architects, technical architects, or engineers, in accordance with the Building Management Act.

Responsibility of the homeowners' association

The obligation to commission and submit it lies with the building's owners, typically the homeowners' association through its president and administrator. The cost is shared as a common expense.

Documentation to be provided

Blueprints, previous building inspection reports (ITE), certificates of completed works, elevator and facility maintenance contracts, and any prior technical reports. The more documentation provided, the more accurate and efficient the report will be.

‍

How the building assessment is conducted

Visual inspection and data collection

The technician visits the building to inspect common areas and, if necessary, individual units to access courtyards, roofs, or structural elements. They take photographs and measurements.

Review of structure, facade, roof, and facilities

The technician checks for cracks, dampness, loose materials, structural corrosion, deformations, and the condition of common facilities. If serious issues are detected, they may recommend further testing or exploratory openings.

Accessibility assessment

The technician evaluates routes, level changes, elevators, and passage widths, proposing reasonable adjustments where the building does not meet requirements.

Energy certificate and registration of results

The technician calculates the building's energy rating and drafts the report. In the Community of Madrid, the Building Evaluation Report (IEE) is filed with the Unified Integrated Registry of Building Evaluation Reports within a maximum period of three months from the inspection.

‍

¿Quieres libertad financiera? Descarga la guía gratuita del paso a paso

‍

Favorable or unfavorable results: what they imply

Minor, major, and very serious deficiencies

The report classifies deficiencies by severity and urgency. Minor issues require maintenance; major issues require repairs within a specified timeframe; very serious issues require immediate action.

Urgent measures and remedial works

If there is a risk to individuals, the technician must propose urgent measures, such as protective netting on the facade or structural shoring. Subsequently, the homeowners' association must carry out the necessary works, which are typically funded through a special assessment.

Follow-up, certificates, and re-inspection

Once the works are completed, a technician issues a certificate of remediation, which is submitted to the city council. Until this is done, the building retains its unfavorable status.

‍

How to process the IEE in Madrid

Submission and registration

In the city of Madrid, the IEE is submitted electronically. Information regarding deadlines and forms can be found on the Madrid City Council's electronic office and the Community of Madrid website.

Deadlines and frequency

A complete IEE is valid until December 31 of the tenth year following its submission. After this period, it must be renewed. If the ITE renewal coincides with the IEE deadline, the IEE is submitted directly.

Record-keeping by the homeowners' association

The homeowners' association must keep the report, certificates of completion, and documentation of any work performed. This is part of the building's history and will be requested during future inspections and property sales.

‍

IEE costs and subsequent expenses

Factors determining fees

There is no official rate. The price depends on the size of the building, the number of units, its complexity, the available documentation, and whether there is an existing, valid ITE that can be utilized.

Construction, accessibility, and energy efficiency

The report itself is usually the least expensive part. The costs arise from the work it may require: facade repairs, roof waterproofing, elevator installation, or insulation.

Available grants and financing

Public grants are available for preparing the report and for renovation work, provided by state, regional, and municipal authorities. There is also an income tax deduction for energy improvement work in residential buildings, applicable to projects completed by December 31, 2027. Check which programs are still open in your municipality before commissioning any work.

‍

Consequences of failing to submit the IEE

  • City council requirement to submit it within a specific timeframe.
  • Potential zoning violation for failing to meet maintenance and inspection duties, subject to penalties under applicable regulations.
  • Coercive fines if requirements are ignored.
  • Subsidiary execution: the city council may commission the report or the work and charge the costs to the homeowners' association.
  • Ineligibility for public grants for renovation.
  • Risk of building issues worsening without detection, leading to more expensive repairs later.
  • Disadvantage in property sales: an increasing number of buyers and investors request the report before making an offer.

‍

What a buyer or investor should review

This is the part of the IEE that we examine before purchasing:

Date, result, and validity of the report

Check if it exists, when it was conducted, if it is registered, and whether the result was favorable or unfavorable. A building over 50 years old without an IEE or ITE is a red flag.

Pending work and approved assessments

If there are serious deficiencies, ask whether the work has already been completed, if it has been approved, or if it has not yet been voted on. Each case changes who pays and how much.

Minutes, budgets, and reserve funds

Cross-reference the Building Evaluation Report (IEE) with the community minutes and the reserve fund. An unfavorable IEE with a minimal reserve fund and no approved works anticipates a significant special assessment.

In our renovation projects, the IEE helps us distinguish between what is our responsibility (the interior of the apartment) and what is the community's responsibility (facade, roof, installations). As Óscar Peñaranda explains, "project selection is crucial for offering high profitability in a short period," and an unforeseen community project can extend that timeline.

‍

How Domoblock uses the IEE to anticipate building works and expenses

The IEE can reveal deficiencies, barriers, and energy-related actions that change a project's budget and schedule. Before investing from €200 entirely online via tokens and blockchain, review the report, pending works, and risks reflected in the documentation. Technology facilitates access, but it does not replace the technical, legal, and financial assessment of the property.

‍

Frequently Asked Questions (FAQs)

Does the IEE serve as an energy certificate for selling my apartment?

No. The IEE includes the energy certificate for the entire building, but to sell or rent a property, you need its own energy efficiency certificate. Although they may sometimes be based on building data, they are distinct documents, and the one for the specific unit is what must be displayed in the listing.

What is the difference between the IEE and the Existing Building Book?

The IEE diagnoses the current state of the building. The Existing Building Book goes further: it includes that diagnosis along with a medium- and long-term action plan for phased rehabilitation. It is a voluntary document in many cases, but it is useful for accessing grants and planning special assessments.

Can a buyer request to see the IEE before signing?

There is no general legal obligation to provide it during a sale, but it is reasonable to request it along with the minutes and the certificate of debt. If the seller does not provide it, you can ask the community administrator for it or make the earnest money agreement conditional upon its review.

How long does it take to complete an IEE?

It depends on the size of the building and the available documentation. The inspection is usually carried out over one or more days, and drafting the report can take several weeks. It is advisable not to wait until the last minute to avoid having to submit it in a rush.

Does a building in another autonomous community have to perform an IEE?

It depends on local regulations. The IEE has a national framework, but each autonomous community and municipality decides which buildings are required to have one, based on age and frequency. Some municipalities only maintain the ITE (Building Inspection). Always check the local ordinance.

What happens if the building has an unfavorable IEE and I renovate my apartment?

Your interior renovation can proceed, but it does not resolve common issues, and you will have to pay your share of any approved works. If you are going to invest in the property, calculate the potential special assessment beforehand, as it may affect the sale price or rental profitability.

‍

¿Quieres libertad financiera? Descarga la guía gratuita del paso a paso

‍

Conclusion

The IEE is the best summary available of a building's condition, yet almost no one asks for it before buying. Our practical advice: if you are buying in a building that is over 40 or 50 years old, request the IEE or ITE, the minutes from the last three years, and the reserve fund status, and review them together. If the report is unfavorable and there are no approved works, calculate your share of the future assessment and subtract it from your offer.

 

‍

Author

Sergio Navarro

Expert in blockchain, investments, and personal finance

Do you like what you're reading?

Subscribe to our Newsletter

Do you like what you're reading?

Subscribe to our newsletter!

Funded

Zaragoza | Downtown

5 Pedro María Ric

DOMO-ZGZ-12
Flipping house

Funded

100%

€550,012.94

Target

€550,012.94

Estimated annual return:
12.13%
Estimated duration:
8 months
Chat with other investors and ask your questions in our Telegram group

Related articles